Strategic engineering for your key construction projects and investments. We handle demanding MV/LV (VN/NN) line relocations for linear structures and secure grid connection for large-capacity sources — photovoltaic power plants and battery energy storage systems (BESS). We take your investment project all the way to a legally valid permit — without unnecessary delays and under the stamp of an authorised engineer.
Our work doesn't end with the project documentation. We take over negotiations with the distributor, landowners and the relevant authorities and drive them through to a legally valid permit.
For PV and BESS developers
Connecting a large-capacity source or battery storage system to the grid typically gets delayed at the distributor. We guide you through the entire process — from the connectability study and RTU communication setup with the dispatch centre, to obtaining the final UPOS (trial operation for compliance verification) and UTP (permit for permanent operation) for systems above 100 kW. All in coordination with ČEZ Distribuce, EG.D or PRE.
For linear and transport structures
A clash between the route and the distribution network stops the entire construction process. We secure the design and the relocation permit, handle the property-law agenda, easements (SoBS VB — future easement agreements) and temporary traffic measures (DIO), and represent you at site inspection days — so construction continues on schedule and without contractual penalties.
For commercial and industrial sites
A site needs a higher reserved capacity that isn't freely available from the distributor. We design the power supply solution — including battery integration for peak shaving and smart substations (smart grids) — negotiate the reserved capacity and optimise your additional connection costs.
In large design offices, your project is often taken over by a less experienced engineer and becomes just one item in a long queue. With us you get the opposite — we work in a focused way and on a strictly limited number of projects.
As a long-standing contractual partner of ČEZ Distribuce, we know the approval processes from the inside. While others handle their queries through a call centre, we know exactly whom to contact directly.
We quickly assess the brief and identify the critical bottleneck. We clearly tell you what is solvable and which way.
We take over the entire agenda. We handle negotiations with authorities and the distributor while you focus on construction.
Stamp, UTP (permit for permanent operation), relocation permit, connection agreement — fully secured.
Is the grid connection of your battery storage system delayed at the distributor? Do you need to increase the MV capacity for your site? Let's talk.
Send an e-mail →